Skip to Content
Skip to Navigation
Capital Transportation Program (CTP)
Capital Transportation Program - FY 2006 - FY 2011
Alphabetical Index
- 4th street, walnut street to i-95
(wilmington traffic calming, pedestrian, and transit improvements)
- 12th Street connector [project no. 24-044-02]
(Wilmington traffic calming, pedestrian, and transit improvements)
- a Street, South Market Street to South Walnut Street - Street improvements [project no. 24-121-03]
(Wilmington Riverfront)
- administration
(planning)
- aeronautics [project no.'s 24-522-01 and 24-522-06]
- Alternate route 54, lighthouse Road (signage only) [project no. 24-112-02]
(SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick)
- Alternate SR24, (phase i) signs [project no. 24-112-08] & SR24 (phase ii) roundabout at s 48, zoar Road, s325, speedway Road, and s326, bethesda Road
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- area legislative short term improvements
(route 1, beach area improvements)
- areawide sidewalks/Bus stops [project no.'s 99-019-03, 21-116-01, 22-116-01, 23-116-01, and 25-116-01]
(churchman's crossing corridor, improvements)
- beach area park and ride
(route 1, beach area improvements)
- bicycle, pedestrian and other improvements
- bioswale modification [project no. 24-121-02]
(Wilmington Riverfront)
- bird husband and murphy houses
(blue ball properties, SR141 and US202 area improvements)
- blades marina [project no. 22-200-01]
(transportation enhancements)
- blue ball barn [project no.'s 22-106-03 and 24-106-02]
(blue ball properties, SR141 and US202 area improvements)
- blue ball properties, SR141 and US202 area improvements
- br 1-001 and br 1-001a on rising sun lane over brandywine creek [project no. 21-074-01]
- br 1-001b on SR 52, kennett pike over railRoad east of SR141 [project no. 99-071-08]
- br 1-068 and br 1-002 on n232, rockland Road over brandywine creek [project no. 22-071-01]
- br 1-118 on n258, barley mill Road at ashland [project no. 25-074-01] and br 1-137 on mill Road over red clay creek [project no. 22-074-14]
- br 1-141 on SR 48, lancaster pike, over chestnut run [project no. 23-071-03]
- br 1-155 on n 12, old capitol trail and br 1-193 on newport Road over red clay creek [project no. 22-074-02]
- br 1-160 on n336, maryland avenue over little mill creek, next to canby park [project no. 22-074-01]
- br 1-201 on beech hill drive over pike creek [project no. 23-071-04]
- br 1-234 maintenance pedestrian improvements
(churchman's crossing corridor, improvements)
- br 1-299 on SR 71, red lion Road over red lion creek [project no. 22-074-06]
- br 1-307 on SR 9, river Road over getty pipe line and br 1-311 on SR 72, wrangle hill Road over dragon run creek [project no. 22-071-04]
- br 1-346 on n408, old cooch's bridge Road over tributary of the upper reaches of christina river [project no. 22-071-02]
- br 1-361 on SR 72, sunset lake Road over muddy run, South of newark [project no. 22-071-03]
- br 1-394n and br 1-394s on US13 over drawyers creek [project no. 23-071-02]
- br 1-431 on SR 15, dexter's corner Road, South of townsend [project no. 23-071-05]
- br 1-506 on n399, chesapeake city Road over summit bridge Road [project no. 22-074-05]
- br 1-510 on US13, northbound, South of odessa [project no. 23-071-06]
- br 1-600 on SR141, ferris Road over SR2, kirkwood highway
- br 1-660 and br 1-664 on US13, Southwest of new castle [project no. 24-074-05]
- br 1-680, US13 and SR141, basin Road [project no. 99-071-10]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- br 1-687, South Walnut Street and br 1-688, South Market Street over christina river.
- br 1-688 on South Market Street over christina river [project no. 21-074-07]
- br 1-708 and br 1-709 on i-95 over SR 72, sunset lake Road and br 1-711 on n 48, salem church Road over i-95 [project no. 22-074-08]
- br 1-715, br 1-715a, and br 1-715d at i-95 / SR273 interchange, near christiana [project no. 22-074-09]
- br 1-746 on i-95 over little mill creek, near Wilmington [project no. 22-074-10]
- br 1-806, br 1-807, and br 1-808 on i-495 over US13 [project no. 22-071-05]
- br 1-813 on i-495 over christina river [project no. 94-074-11]
- br 1-820n and br 1-820s on i-495 over norfolk Southern, br 1-821n and br 1-821s, and br 1-822n and br 1-822s on i-495 over amtrak / norfolk Southern, edgemoor [project no. 22-074-11]
- br 2-010a on SR 6 over duck creek, woodland beach [project no. 22-075-02]
- br 2-022a on SR 14, northwest front Street over mullet run [project no. 23-072-01]
- br 2-050b on SR 8, halltown Road, over tappahanna ditch [project no. 24-072-01]
- br 2-113b and br 2-113c on k113, cattail branch Road [project no. 23-072-02]
- br 2-210a on k210, shady bridges Road over shades branch, South of marydel [project no. 21-072-01]
- br 2-295a on k295, pear tree lane, over green branch [project no. 24-072-02]
- br 3-122 on s567a, handy Road over houston branch [project no. 24-073-02]
- br 3-141 on s583 over polk branch, north of bridgesville [project no. 23-073-02]
- br 3-210 on s487, gum branch Road over gum branch [project no. 23-073-01]
- br 3-237 on s 46, elks Road over gravelly branch, seaford [project no. 21-076-01]
- br 3-328 on s454, oak branch Road over figgs ditch, east of delmar [project no. 24-073-03]
- br 3-330 on oak lane over rossakatum branch, laurel [project no. 24-073-01]
- br 3-362 on s465, chipmans pond Road at chipman's pond, laurel [project no. 25-073-01]
- br 3-365n and br 3-365s on north and South US13 over records pond, east of laurel [project no. 21-076-03]
- br 3-376 on s376 over sandy branch, selbyville [project no. 24-073-04]
- br 3-806
(milton truck bypass, SR 5, union Street to SR 30, isaacs Road)
- br 3-918 on SR 30, isaacs Road, over reynolds pond [project no. 24-073-05]
- brandywine valley railway [project no. 23-516-01]
(rail preservation)
- bread and cheese island [ID no. 05-00094]
- bridges preservation program
- bridges projects
- browntown pedestrian walkway from community center to stadium area [project no. 22-121-02]
(Wilmington Riverfront)
- bulk oil and auto transmission fluid tank
(transit facilities, sussex county)
- bulkhead rehabilitation [project no. 24-121-01]
(Wilmington Riverfront)
- bus equipment
- camden service Road [project no. 24-124-02]
- christina river bridges
(Wilmington Riverfront)
- christina river, shellpot rail bridges improvements [project no. 23-512-02]
- churchman's crossing corridor improvements [project no. 20-041-01]
- churchman's crossing (fairplay) station parking [project no. 99-512-01]
(rail improvements, newark to Wilmington)
- churchman's crossing station public announcement system [project no. 21-512-01]
(rail improvements, newark to Wilmington)
- churchman's crossing station slope treatment
(rail improvements, newark to Wilmington)
- churchman's parking garage [project no. 99-512-01]
(transit facilities, new castle county)
- churchman's Road bridges [project no. 91-071-05]
(i-95, maryland state line to SR141)
- claymont security structure
(transit facilities)
- community transportation fund
- commuter rail cars for r2 service
(rail improvements, newark to Wilmington)
- concrete tie improvements on track 1, between ragan and davis interlockings [project no. 23-512-03]
(rail improvements, newark to Wilmington)
- consolidated electric - dart iii [project no. 22-502-01]
(transit facilities, new castle county)
- corridor capacity preservation and advanced acquisition of rights of way
- corridor preservation - advance right-of-way acquisition
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- corridor preservation and advance right-of-way acquisition
(SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick)
- courthouse area improvements [project no. 23-121-03]
(Wilmington traffic calming, pedestrian, and transit improvements)
- dart headquarters [project no. 23-531-03]
(transit facilities, new castle county)
- dast
(transportation facilities)
- del tech georgetown, SR 18, seashore highway, pedestrian and bicycle improvements [project no. 20-013-05]
(bicycle, pedestrian and other improvements)
- delaware transit corporation - resort area parking study
(planning)
- delaware transit corporation - update facility plan
(planning)
- development coordination
(planning)
- development signage
signage and pavement markings)
- dover operations center, generator upgrades
(transit facilities, statewide)
- dover operations center, replace lift
(transit facilities, statewide)
- DRBA bridges
(i-295 improvements)
- dupont Road, brandon lane to new castle county police substation [project no. 23-106-06]
(tyler mcconnel bridges, SR141, montchannin Road to alapocas Road)
- east coast greenway, new castle
(bicycle, pedestrian and other improvements)
- east side park improvements [project no. 22-106-03]
(blue ball properties, SR141 and US202 area improvements)
- east side Roads [project no. 23-106-05]
(blue ball properties, SR141 and US202 area improvements)
- east side wooded greenway [project no. 22-106-03]
(blue ball properties, SR141 and US202 area improvements)
- ebright Road
(traffic calming)
- eden square connector [project no. 98-119-02]
(us 40, maryland state line to US13, corridor improvements)
- emergency bridges reconstruction from major storm damage
(bridges projects)
- emergency paving from major storm damage
(paving program)
- engineering and contingencies
- environmental improvements
- equipment
- E-ZPass
- facilities maintenance
(transit facilities, statewide)
- georgetown parking facility
(transit facilities, sussex county)
- georgetown pedestrian and bicycle plan [project no. 22-017-01]
(bicycle, pedestrian and other improvements)
- georgetown to lewes rail to trail conversion (study)
(route 1, beach area improvements)
- glenville wetland mitigation [project no. 24-037-03]
- harrington truck route [project no. 21-045-01]
- highway safety improvement program (hsip) [project no.'s 23-010-01 and 24-010-02]
(safety improvement program)
- historic red clay valley maintenance agreement [project no. 24-516-01]
(rail preservation)
- i-95, fifth lane expansion from churchman's bridges to SR141, basin Road [project no. 23-690-03]
(i-95, maryland state line to SR141)
- i-95, maryland state line to SR141
- i-95, n213, carr Road and n 3, marsh Road interchange improvements [ID no. 03-00034]
- i-95 northbound ramp to US202 Southbound [project no. 23-106-07]
(blue ball properties, SR141 and US202 area improvements)
- i-95 / US202 interchange [ID no. 04-00095]
- i-95, Wilmington viaduct to US202 [project no. 23-074-03]
- i-295 improvements [ID no. 04-00675]
- indian river inlet bridges and area improvements [project no.'s 21-076-05, 22-500-48 and 23-073-03]
- industrial parks
(paving program)
- ING Riverfront parking garage [project no. 23-121-02]
(transit facilities, new castle county)
- intersection improvements
- intersection improvements at SR 5, harbeson Road and s319, airport Road
(milton truck bypass, SR 5, harbeson Road to SR 30, isaacs Road)
- intersection improvements at SR 30, isaacs Road and s319, airport Road
(milton truck bypass, SR 5, harbeson Road to SR 30, isaacs Road)
- justison Street and public works [project no.'s 24-121-04 and 24-121-07]
(Wilmington Riverfront)
- k 99, college Road, SR 15, saulsbury Road to k104, kenton Road [ID no. 03-00098]
- k104, kenton Road, k158, chestnut grove Road to SR 8, forrest avenue
(bicycle, pedestrian and other improvements)
- k134, duck creek parkway, sidewalk and shoulder improvements, smyrna [ID no. 04-00614]
- k137, carter Road, k 90, sunnyside Road to SR300, wheatley's pond Road [project no. 23-016-01]
- k156, saulsbury Road [project no. 23-035-01]
(materials and minor contracts)
- k157, walker Road, k104, kenton Road to SR 15, saulsbury Road, dover [project no. 20-045-01]
- k294a, crawford carroll avenue, dover [project no. 93-012-01]
- king Street and orange Street, martin luther king (mlk) boulevard to 13th Street
(Wilmington traffic calming, pedestrian, and transit improvements)
- laurel five points [project no. 22-124-02]
(US13, sussex highway, laurel intersections improvements)
- lewes boat ramp
(route 1, beach area improvements)
- lighting
(i-295 improvements)
- local Roadway improvements
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- local Roadway improvements
(SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick)
- local Roadway improvements, SR 17, roxanna Road to s361, muddy neck Road [project no. 21-112-04]
(SR26, US113 to assawoman bay)
- longfellow drive over ball run, culvert replacement [project no. 24-071-01]
- loockerman Street and forest Street intersection improvements, dover [project no. 23-042-01]
- loockerman Street bridges and sidewalk improvements, dover
(bicycle, pedestrian and other improvements)
- madison Street
(transit facilities, new castle county)
- Market Street, phase ii (7th Street to 9th Street) [project no. 23-011-03]
(Wilmington traffic calming, pedestrian, and transit improvements)
- Market Street, phase iii (mlk boulevard to 7th Street) [project no. 24-011-03]
(Wilmington traffic calming, pedestrian, and transit improvements)
- marsh Road [project no. 25-092-01]
(traffic calming program)
- materials and minor contracts
- mcmullen farm [project no. 23-101-01]
(SR 7, Bear-Christiana Road and us 40 area improvements)
- metropolitan planning organizations
(planning)
- mid county facility [project no. 98-502-01]
(transit facilities, new castle county)
- mifflin Road roundabout [project no. 20-042-01]
(traffic calming program)
- milton truck bypass, SR 5, harbeson Road to SR 30, isaacs Road [project no. 21-046-01]
- minor capital improvements life safety/ADA
(transportation facilities)
- monroe security
(transit facilities, new castle county)
- monroe Street operations center bus wash and vacuum system [project no. 24-504-05]
(transit facilities, statewide)
- monroe Street operations center, boiler replacement
(transit facilities, statewide)
- monroe Street operations center, concrete replacement
(transit facilities, statewide)
- monroe Street operations center, lighting upgrade
(transit facilities, statewide)
- monroe Street operations center, sand filter installation
(transit facilities, statewide)
- municipal Street Aid
- n 37, airport Road and SR 58, churchman's Road intersection [project no. 22-111-02]
- n 69, wilton boulevard/n343, appleby Road sidewalks [project no. 22-119-05]
(us 40, maryland state line to US13, corridor improvements)
- n209, grubb Road, SR261, faulk Road to SR 92, naaman's Road, pedestrian improvements [ID no. 06-00002]
- n209, harvey Road, sconset Road to n 3, marsh Road, traffic calming [project no. 21-690-08]
- n263, rolling mill Road retaining wall [project no. 22-007-01]
(br 1-118 on n258, barley mill Road over red clay creek at ashland, br 1-137 on n263, rolling mill Road over red clay creek, and n263, rolling mill Road retaining wall)
- n274, brackenville Road, SR 41, lancaster pike to n258, barley mill Road [project no. 20-044-01]
- n282, mill creek Road [project no. 24-471-01]
- n282, mill creek Road and n276, mckennan's church Road intersection improvements [project no. 24-041-01]
- n282, mill creek Road and n283, stoney batter Road intersection [project no. 24-041-03]
- n318, milltown Road drainage improvements [ID no. 06-0003]
- n344, school bell Road, SR 7, bear christiana Road to us 40 [project no. 23-119-05]
(us 40, maryland state line to US13, corridor improvements)
- n346, walther Road sidewalks, n336, old baltimore pike to us 40 [project no. 24-119-04]
(us 40, maryland state line to US13, corridor improvements)
- n348, salem church Road, n347, chapman Road to dunsmore drive [project no. 22-041-01]
- n352, red mill Road sidewalk [project no. 21-116-02]
(churchman's crossing corridor improvements)
- n382, church Road connector [project no. 23-119-03]
(us 40, maryland state line to US13, corridor improvements)
- n382, church Road, us 40 to queensbury village [project no. 20-119-01]
(us 40, maryland state line to US13, corridor improvements)
- n385, reybold Road, SR 72, sunset lake Road to n 48, salem church Road [project no. 23-119-01]
- n407, mccoy Road, n409, kirkwood st. georges Road to SR 72, wrangle hill Road [ID no. 04-00605]
- nassau pedestrian / bicycle connection [project no. 23-125-02]
(route 1, beach area improvements)
- national pollutant discharge elimination system (npdes)
(materials and minor contracts)
- new castle city improvements [project no. 24-041-02]
- new technology and inspection
(paving program)
- newark train station site acquisition and relocation [project no. 24-512-02]
(transit facilities, new castle county)
- newark transit hub [project no. 23-019-01]
- newtown Road, SR896, South college avenue to SR 72, South chapel Street [ID no. 04-00185]
- newtown trail [project no. 23-200-13]
(us 40, maryland state line to US13, corridor improvements)
- north bowers beach [project no. 21-035-02]
(materials and minor contracts)
- northeast corridor improvements
(rail improvements, newark to Wilmington)
- northeast corridor recapitilization
(rail preservation)
- old cooch's bridges Road
(traffic calming program)
- old forge Road
(traffic calming program)
- operational safety improvements [project no. 24-083-05]
(safety improvements program)
- other paving and patching
(paving program)
- park avenue, georgetown [ID no. 04-00005]
- parking facilities
- passenger facilities - bus stop improvements
- passenger rail, middletown to newark [project no. 22-690-04]
- pavement markings [project no. 24-083-02]
(signage and pavement markings)
- pavement rehabilitation
(paving program)
- pavement resurfacing
(paving program)
- paving program
- planning
- pomeroy branch, pedestrian and bicycle facility
(bicycle, pedestrian and other improvements)
- port of Wilmington [project no.'s 24-099-01 and 25-099-01]
- pyles lane at abandoned railRoad
(materials and minor contracts)
- rail crossings closures/upgrades, wyoming (formerly camden wyoming avenue and Southern boulevard, wyoming, te project) [project no. 23-005-02]
(rail crossing safety)
- rail crossing safety
- rail improvements, newark to Wilmington [project no. 24-514-01]
- rail preservation
- railRoad right of way
(rail preservation)
- rehoboth avenue improvements [project no. 22-025-01]
- rehoboth beach park and ride upgrades
(transit facilities, statewide)
- rehoboth entrance improvements [project no. 24-125-01]
(route 1, beach area improvements)
- rehoboth facilities expansion
(transit facilities, sussex county)
- rehoboth to lewes bicycle path [project no. 23-125-01]
(route 1, beach area improvements)
- relocation of water Street transfer hub, dover [project no. 25-020-01]
- rivers end/providence/taylor drive, sidewalk improvements [project no. 24-119-03]
(us 40, maryland state line to US13, corridor improvements)
- rivers end and providence drive sidewalks [project no. 24-119-03]
(us 40, maryland state line to US13, corridor improvements)
- riverview estates
(materials and minor contracts)
- riverwalk, South Market st. to South Walnut st. with sidewalk connections to bridges [project no. 24-121-05]
(Wilmington Riverfront)
- riverwalk viii, South of shipyard shops through peterson preserve [project no. 20-121-01]
(Wilmington Riverfront)
- Roadway signage (braided route)
(signage and pavement markings)
- rose hill subdivision
(traffic calming program)
- ronald mcdonald house access [project no. 23-106-04]
(blue ball properties, SR141 and US202 area improvements)
- ronald mcdonald house privacy wall [project no. 24-106-03]
(blue ball properties, SR141 and US202 area improvements)
- route 1, beach area improvements [project no. 20-125-01]
- route deviation service
(us 40, maryland state line to US13, corridor improvements)
- rue madora drive [project no. 22-119-04]
(us 40, maryland state line to US13, corridor improvements)
- s 84, central avenue improvements, s384, bayard Road to s368 beaver dam Road [project no. 24-112-04]
(SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick)
- s266, new Road from nassau to s267, pilottown Road - shoulder improvements [project no. 24-125-02]
(route 1, beach area improvements)
- s273a, bay vista Road intersection improvements
(route 1, beach area improvements)
- s275, plantations Road
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- s277, angola Road, s279, camp arrowhead Road to SR24, john j. williams highway [project no. 24-112-06]
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- s279, camp arrowhead Road between s277, angola Road and SR24, john j. williams highway [project no. 25-112-02]
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- s298, banks Road, SR23, long neck Road to SR24, john j. williams highway [project no. 24-112-03]
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- s318, patriots way, US113 to s 48, zoar Road [project no. 25-112-01]
(SR24, john j. williams highway, SR 30, gravel hill Road to SR1, coastal highway)
- s319, airport Road
(milton truck bypass, SR 5, harbeson Road to SR 30, isaacs Road)
- s387, hudson Road, maryland state line to SR 54 improvements
(SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick)
- s401, clayton avenue, frankford [ID no. 02-00023]
- safety improvement program
- signage and pavement markings
- snuff mill Road
(traffic calming program)
- songsmith drive sidewalks, mcmullen circle to smalley's dam Road and waterford pedestrian access [project no. 22-119-02]
(us 40, maryland state line to US13, corridor improvements)
- South bethany beach canal drainage improvements, anchorage canal [project no. 22-036-02]
(materials and minor contracts)
- Southern new castle county improvements
- Southern new castle county local Road circulation plan [project no. 21-120-02]
(Southern new castle county improvements)
- special needs
(paving program)
- SR 1, bay Road / k 19, thompsonville Road, intersection improvements [project no. 24-122-01]
- SR 1, bay Road / k120, milford neck Road, South frederica intersection improvements [ID no. 06-00005]
- SR 1, bay Road, little heaven intersection improvements [project no. 24-122-02]
- SR 1, bay Road / SR 9, bayside drive, intersection improvements [project no. 24-122-04]
- SR 1, bay Road / SR 12, frederica Road, north frederica intersection improvements [project no. 24-122-03]
- SR 1, c&d canal bridges and summit bridges [project no. 25-071-01]
(bridges projects)
- SR 1, coastal highway, connector Road, rehoboth entrance to north of us 9 (nassau), western parkway [project no. 25-125-01]
(route 1, beach area improvements)
- SR 1, coastal highway, dewey beach to rehoboth and lewes canal, improvements [project no. 20-013-03]
- SR 1, coastal highway from bedford avenue to houston Street, and SR 1a from SR 1 to silver lake, dewey beach pedestrian / bicycle improvements [project no.'s 20-013-04 and 24-013-01]
(route 1, beach area improvements)
- SR 1, coastal highway, pedestrian improvements, s271, holland glade Road to north of us 9 (five points)
(route 1, beach area improvements)
- SR 1, coastal highway, s 12, wescoats Road, s 18, savannah Road, triangle improvements, including dartmouth drive [project no. 23-122-01]
(route 1, beach area improvements)
- SR 1, coastal highway (Southbound third lane), SR24 to north of us 9 (five points) [project no. 22-125-01]
(route 1, beach area improvements)
- SR 1, coastal highway, SR 30, cedar creek Road, interchange, South of milford [ID no. 04-00616]
- SR 1/I-95 interchange (project no. 25-090-01]
(i-95, maryland state line to SR141)
- SR 1, South of dover to South of chesapeake and delaware canal [project no's. 83-110-01 and 83-110-02]
- SR 1 / SR 8 partial interchange, dover [project no. 22-110-01]
- SR 1, tybouts corner to SR273
(paving program)
- SR 1, weigh station
(truck weight enforcement)
- SR2, elkton Road, maryland state line to SR273, delaware avenue, newark [project no. 24-044-01]
- SR2, kirkwood highway and n352, red mill Road intersection improvements, newark [ID no. 04-00592]
- SR2, kirkwood highway, from SR141, centre Road to SR100, dupont Road, elsmere
- SR2, kirkwood highway/n355, harmony Road
(churchman's crossing corridor, improvements)
- SR 2, kirkwood highway/SR 7, limestone Road [project no. 20-111-02]
(churchman's crossing corridor, improvements)
- SR 2, South union Street from railRoad bridges to sycamore Street, Wilmington [project no. 24-011-02]
- SR 3, marsh Road and n 43, washington Street extension, pedestrian improvements
(bicycle, pedestrian and other improvements)
- SR 3, marsh Road pedestrian improvements
(bicycle, pedestrian and other improvements)
- SR 4, christina parkway from SR2, elkton Road to SR896, South college avenue, newark [project no. 24-103-01]
- SR 4, ogletown stanton Road/n355, harmony Road [project no. 24-116-01]
(churchman's crossing corridor, improvements)
- SR 4, ogletown stanton Road/SR 7, christiana stanton Road phase i, stanton split [project no. 20-111-01]
(churchman's crossing corridor, improvements)
- SR 4, ogletown stanton Road/SR 7, christiana stanton Road phase ii (j. p. morgan)
(churchman's crossing corridor, improvements)
- SR 4, ogletown stanton Road/SR 58, churchman's Road
(churchman's crossing corridor, improvements)
- SR 7, Bear-Christiana Road and US 40 area improvements
- SR 7, Bear-Christiana Road, Newtown Road to SR273, frenchtown pike [project no. 23-126-01]
(SR 7, Bear-Christiana Road and us 40 area improvements)
- SR 7, Bear-Christiana Road, us 40 to newtown Road [project no. 20-126-01]
(SR 7, Bear-Christiana Road and us 40 area improvements)
- SR 7, limestone Road and n234, valley Road area improvements [ID no. 04-00677]
- SR 7, limestone Road from arundel to n283, stoney batter Road [project no. 22-011-03]
(bicycle, pedestrian and other improvements)
- SR 7, limestone Road, north of SR 72, paper mill Road to pennsylvania line, dualization [ID no. 04-00597]
- SR 8, forrest avenue and k 44, pearson's corner Road, dover [ID no. 04-00609]
- SR 8, forrest avenue and SR 15, saulsbury Road, dover [ID no. 05-00095]
- SR 9, capacity improvements
(new castle city improvements)
- SR 9, river Road area improvements
(new castle city improvements)
- SR 9, Wilmington Road and delaware Street, intersection improvements
(new castle city improvements)
- SR 9, Wilmington Road and third Street and sixth Street [project no. 24-041-02]
(new castle city improvements)
- SR 15, canterbury Road from k407, airport Road to k447, holly hill Road, milford [project no. 21-042-01]
- SR 15, choptank Road from n437, bunker hill Road to n286, bethel church Road [project no. 22-120-01]
- SR 15, greenspring Road and vandyke Road [project no. 21-034-03]
(materials and minor contracts)
- SR 15, greenspring Road near blackbird forest
(material and minor contracts)
- SR 15, moorton Road and k152, lynnbury woods Road,intersection and rail crossing improvements [ID no. 04-00585]
- SR 16, ellendale-greenwood highway, east of greenwood to SR 1, coastal highway [ID no. 05-00092]
(sussex county west / east improvements)
- SR24 and SR 54 areas, transit improvements
(transit vehicle expansion, sussex county)
- SR24, john j. williams highway and SR 5, long neck Road intersection, northeast of millsboro [project no. 91-003-01]
- SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway mainline improvements [project no. 24-112-09]
(SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway)
- SR24, john j. williams highway, SR 30, gravel hill Road to SR 1, coastal highway [project no. 21-112-01]
- SR26, atlantic avenue main improvements [project no. 24-112-10]
(SR26, US113 to assawoman bay)
- SR26, US113 to assawoman bay [project no. 99-112-01]
- SR26, vines creek Road and SR20, amory Road/omar Street, dagsboro intersection [project no. 24-112-07]
(SR26, US113 to assawoman bay)
- SR 36, shawnee Road, US113, dupont boulevard west of milford to SR404, seashore highway east of greenwood [ID no. 05-00091]
(sussex county west / east improvements)
- SR 41, lancaster pike, north of n234, valley Road to north of schoolhouse Road [project no. 20-007-02]
- SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick,mainline improvements [project no. 24-112-01]
(SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick)
- SR 54, lighthouse Road, US113, dupont boulevard to s 58c, keenwick [project no. 21-112-02]
- SR 58, churchman's Road from SR 4, ogletown stanton Road to SR2, kirkwood highway
(churchman's crossing corridor improvements)
- SR 72 area park and ride
(us 40, maryland state line to US13, corridor improvements)
- SR 72 bikeway extension, from i-95 to South of n356, old baltimore pike [project no. 20-015-03]
(bicycle, pedestrian and other improvements)
- SR 72, paper mill Road, newark from cleveland avenue to n324, ebeneezer church Road [project no. 20-011-01]
(bicycle, pedestrian and other improvements)
- SR 72, possum park Road from n299, possum hollow Road to n303, old possum park Road [project no. 23-044-01]
- SR 72, wrangle hill Road from n256b, mccoy Road to SR 71, red lion Road
(bicycle, pedestrian and other improvements)
- SR141, barley mill Road and SR100, montchanin Road intersection improvements [project no. 23-106-01]
- SR141, basin Road at i-95 ramps [project no. 96-091-06]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- SR141, basin Road, bridges landscaping improvements at SR2, kirkwood highway [project no. 23-106-08]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- SR141, basin Road from jay drive to burnside boulevard [project no. 23-044-02]
(SR141, basin Road, SR273, frenchtown Road to SR 48,lancaster pike)
- SR141, basin Road from SR273, frenchtown Road to jay drive [project no. 21-061-01]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- SR141, basin Road, safety, from north of US13 beginning at delaware avenue to jay drive [project no. 99-007-01]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike
- SR141, ferris Road from SR2, kirkwood highway to SR 34, faulkland Road [project no. 24-106-04]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- SR141, ferris Road from SR2, kirkwood highway to SR 34, faulkland Road advanced utilities [project no. 24-106-04]
(SR141, basin Road, SR273, frenchtown Road to SR 48, lancaster pike)
- SR141, ferris Road / SR2, kirkwood highway, prices corner pedestrian improvements [project no. 21-011-03]
(bicycle, pedestrian and other improvements)
- SR261, foulk Road pedestrian improvements
(bicycle, pedestrian and other improvements)
- SR273, christiana ogletown Road/n347, chapman Road
(churchman's crossing corridor, improvements)
- SR273, christiana ogletown Road/n355, harmony Road
(churchman's crossing corridor, improvements)
- SR299, middletown odessa Road, n442, silver lake Road to SR 1 [ID no. 06-00001]
- SR404, seashore highway [ID no.05-00093]
(sussex county west / east improvements)
- SR896, South college avenue/i-95 interchange rehabilitation
(i-95, maryland state line to SR141)
- SR896, summit bridges Road, at n 54, howell school Road and n396, denny's Road intersection realignment and n 54, howell school Road pavement reconstruction from SR896, summit bridges Road to SR 71, red lion Road at kirkwood [ID no. 04-00602]
- st. ann's railRoad bridges improvements [project no. 25-071-01]
(bridges projects)
- state owned line [project no. 24-514-02]
(rail preservation)
- statewide and regional planning
(planning)
- statewide facilities, fuel management and storage tanks
(transit facilities, state-wide)
- statewide facilities - general
(transit facilities, state-wide)
- statewide facilities perimeter fencing
(transit facilities, state-wide)
- statistics, research, and special projects
(planning)
- stormwater management-matson run and park amenities [project no. 22-106-03]
(blue ball properties, SR141 and US202 area improvements)
- stormwater management- payback to astra-zeneca [project no. 22-106-05]
(blue ball properties, SR141 and US202 area improvements)
- surface treatment
(paving program)
- surface treatment conversion
(paving program)
- sussex county park and ride and transfer hub
(transit facilities, sussex county)
- sussex county west / east improvements
- technology
- third lane expansion from SR141 to SR 9
(i-295 improvements)
- third rail track expansion [project no. 24-514-01]
(rail improvements, newark to Wilmington)
- toll plaza rehabilitation and highway speed E-ZPass improvements [project no. 24-090-03]
(i-95, maryland state line to SR141)
- traffic calming program
- transit access - park and ride lots
- transit center at astra-zeneca [project no. 24-106-01]
(blue ball properties, SR141 and US202 improvements)
- transit facilities, new castle county
- transit facilities, statewide
- transit facilities, sussex county [project no.'s 24-531-02 and 24-531-03]
- transit vehicle expansion, kent county [project no. 22-503-02]
- transit vehicle expansion, new castle county [project no. 25-503-02]
- transit vehicle expansion, statewide
- transit vehicle expansion, sussex county [project no. 24-503-05]
- transit vehicle replacement and refurbishment, kent county [project no. 24-503-01]
- transit vehicle replacement and refurbishment, new castle county
- transit vehicle replacement and refurbishment, statewide [project no. 24-503-03]
- transit vehicle replacement and refurbishment, sussex county [project no.'s 23-504-02 and 24-504-02]
- transportation enhancements
- transportation facilities
- transportation management improvements
- truck weight enforcement [project no. 23-500-38]
- tyler mcconnell bridges, SR141, montchannin Road to alapocas Road [project no. 93-106-01]
- us 9/SR 1 (five points) interchange (study)
(route 1, beach area improvements)
- us 9, lewes and georgetown highway and s319, airport Road realignment, georgetown [project no. 25-046-01]
- us 9, lewes and georgetown highway and SR 30, gravel hill Road intersection improvements [ID no.05-0090]
- US13 and k241, peach basket Road intersection, felton [project no. 22-042-01]
- US13 and roosevelt avenue
(materials and minor contracts)
- US13 and roosevelt avenue, pedestrian crossing improvements, dover
(bicycle, pedestrian and other improvements)
- US13 and s462, trussum pond Road, signal removal and service Road, east of laurel [project no. 24-124-04]
- US13 and s468, discount land Road [project no. 22-124-01]
(US13, sussex highway, laurel intersections improvements)
- US13 and s468, discount land Road, service Road entrance closure, north of laurel [ID no. 00-00670
- US13 and SR 15, canterbury Road, median closure and lighting improvements, viola [ID no. 04-00672]
- US13 and SR896, boyd's corner Road and SR896, boyd's corner Road [project no. 25-041-04] and SR 71, mt. pleasant intersection improvements [project no. 24-041-01]
- US13, dover curbing, gutter, and landscaping [ID no. 04-00673]
- US13 from delaware state university to smith Street and US13 from north of smith Street to denney's Road
(bicycle, pedestrian and other improvements)
- US13 from South court Street to loockerman Street
(bicycle, pedestrian and other improvements)
- US13 from South white oak Road to townsend boulevard and US13 from loockerman Street to division Street [project no. 20-012-01]
(bicycle, pedestrian and other improvements)
- US13 from townsend boulevard to delaware state university
(bicycle, pedestrian and other improvements)
- US13, laurel intersections improvements [project no. 22-124-04]
(US13, sussex highway, laurel intersections improvements)
- US13, odessa transportation plan implementation [project no. 22-690-07]
- US13, philadelphia pike, claymont transportation plan implementation [ID no. 04-00603]
- US13 ross industrial park access
(US13, sussex highway, seaford intersection improvements)
- US13, South of smyrna to north of smyrna, curbing, gutter, and landscaping [ID no.04-00612]
- US13, sussex highway, and SR404 intersection realignment and bridgesville service Roads [project no. 22-124-06]
- US13, sussex highway, delmar service Road [project no. 22-124-03]
- US13, sussex highway, greenwood service Road [project no. 22-124-05]
- US13, sussex highway intersection improvements [project no. 24-124-01]
(US13, sussex highway, seaford intersection improvements)
- US13, sussex highway, laurel intersections improvements [project no. 22-124-01]
- US13, sussex highway, seaford intersection improvements [project no. 23-124-01]
- US13, sussex highway / US13a, bridgesville highway / s46, old furnace Road intersection [project no. 23-124-01]
(US13, sussex highway, seaford intersection improvements)
- US13, tybouts corner to us 40
- US13a, South governor's avenue, webb's lane to water Street [project no. 20-045-02]
- us 40, bear-glasgow bus stop improvements [project no. 23-119-02]
(us 40, maryland state line to US13, corridor improvements)
- us 40, maryland state line to US13, corridor improvements
- us 40, n346, walther Road to governor's square [project no. 22-119-01]
(us 40, maryland state line to US13, corridor improvements)
- us 40, pulaski highway/SR 72, wrangle hill Road (includes del laws Road intersection [project no. 24-119-01])
(us 40, md. state line to US13, corridor improvements)
- us 40 sidepaths, n 48 salem church Road to SR 1
(us 40, maryland state line to US13, corridor improvements)
- us 40 sidepaths, SR 72, wrangle hill Road to n 48, salem church Road
(us 40, maryland state line to US13, corridor improvements)
- us 40 signing and Streetscape master plan [project no. 22-119-03]
(us 40, maryland state line to US13, corridor improvements)
- US113, dupont boulevard and s36a, seabury avenue, milford [project no. 21-009-01]
- US113, maryland state line to georgetown [project no. 97-109-02]
- US113, milford curbing, gutter, and landscaping [ID no. 04-00613]
- US113, north / South improvements [project no. 22-127-01]
- US113a, South state Street, little heaven to SR 10, lebanon Road [ID no. 04-00607]
- US202, concord pike, augustine cutoff to independence mall [project no. 22-106-06]
(blue ball properties, SR141 and US202 area improvements)
- US202, concord pike, i-95 to augustine cutoff [project no. 24-106-05]
(blue ball properties, SR141 and US202 area improvements)
- US202, concord pike, independence mall to north of powder mill Road [project no. 24-106-06]
(blue ball properties, SR141 and US202 area improvements)
- US202, concord pike/rockland Road material pile [project no. 22-106-04]
(blue ball properties, SR141 and US202 area improvements)
- US202, concord pike sign structures [project no. 23-106-03]
(blue ball properties, SR141 and US202 area improvements)
- us301, maryland state line to SR896 [project no. 25-113-01]
- us301, weigh station [23-500-38]
(truck weight enforcement)
- Walnut Street, martin luther king boulevard to 16th Street (paving and Streetscape) [project no. 24-011-01]
(Wilmington traffic calming, pedestrian, and transit improvements)
- washington Street, new castle from SR273, frenchtown Road/SR141, basin Road to SR 9, sidewalk and intersection improvements [project no. 22-011-04]
(bicycle, pedestrian and other improvements)
- water Street east [project no. 23-121-01]
(Wilmington Riverfront)
- water Street west, shipley Street to west Street [project no. 23-121-04]
(Wilmington Riverfront)
- weave elimination from i-95 to US13
(i-295 improvements)
- webb's lane, new burton Road to US13a [project no. 22-012-01]
(bicycle, pedestrian and other improvements)
- west dover connector [project no. 24-117-01]
- west side improvements [project no. 22-106-01]
(blue ball properties, SR141 and US202 area improvements)
- west side park improvements
(blue ball properties, SR141 and US202 improvements)
- west side wooded greenway [project no. 22-106-03]
(blue ball properties, SR141 and US202 area improvements)
- west Street connector extension [project no. 99-121-02]
(Wilmington Riverfront)
- west Street connector extension, Streetscape, South madison to stadium drive
(Wilmington Riverfront)
- westbound US13 to i-95
(I-295 improvements)
- westtown [project no. 25-128-01]
(Southern new castle county improvements)
- Wetland Mitigation
(environmental improvements)
- Wilmington area free fare zone and paratransit premium fare analysis
(planning)
- Wilmington parking deck
(Wilmington Riverfront)
- Wilmington Riverfront
- Wilmington signal improvements
- Wilmington traffic calming, pedestrian, and transit improvements
- Wilmington train station [project no. 24-512-01]
(transit facilities, new castle county)
- Wilmington transit center [project no. 20-121-02]
(transit facilities, new castle county)
- woodland ferry, bulkhead and ramp replacement [ID no. 04-00671]
- woodland ferry replacement
(equipment)